Why method matters
Consulting engagements fail for predictable reasons: the problem is defined too late, options are not tested against operating reality, implementation is handed over without ownership, and nobody checks whether the result works. Each stage of our method is designed to close one of those gaps.
Stage 1 — Assess: establish the facts
Purpose. Build a shared, evidence-based understanding of the current situation and the decision to be made.
Typical activities
- Confirm the engagement objective, the decision owner and the criteria by which success will be judged.
- Review strategy, financial records, organisation charts, policies, procedures, contracts and performance data.
- Identify legal, regulatory, contractual and standard-specific obligations.
- Interview leaders and process owners; observe operations where relevant.
- Map stakeholders, risks, constraints and dependencies.
- Measure the baseline: financial, operational, compliance, environmental or capability performance as relevant.
Typical outputs: diagnostic report; obligations register; baseline dataset with data-quality notes; risk and opportunity register; confirmed problem statement.
Decision gate 1 — Diagnosis agreed. The client sponsor confirms that the diagnosis is accurate and complete enough to design against.
Stage 2 — Design: develop and test the solution
Purpose. Create options, test them, and agree a target state that is economically sound, operationally feasible and controllable.
Typical activities
- Develop alternative options and evaluate them against agreed criteria, including cost, benefit, risk, timing and capability.
- Model financial and operational consequences, with sensitivity and scenario analysis where uncertainty is material.
- Design the target state: structures, roles and authority; processes and controls; policies; data and performance measures.
- Align the design with applicable standards and frameworks, mapping each requirement to an owner and a piece of evidence.
- Define the implementation roadmap, resourcing, budget and change approach.
Typical outputs: options paper and recommendation; target operating model or system design; requirements-to-evidence map; implementation roadmap and business case.
Decision gate 2 — Design approved. The appropriate authority — board, executive committee or sponsor — approves the design and commits resources.
Stage 3 — Implement: build capability with the client
Purpose. Put the design into operation and build the client's capability to run it.
Typical activities
- Develop policies, procedures, templates, registers and tools in the client's own formats and systems.
- Configure roles, committees, delegation of authority and reporting lines.
- Train leaders, process owners, internal auditors and staff.
- Pilot new processes and controls; refine them on the basis of results.
- Track implementation progress, benefits and risks through a structured programme cadence.
Typical outputs: approved documentation set; trained personnel and competence records; operating records generated by the new system; implementation status reports.
Decision gate 3 — Ready for verification. The system has operated long enough to generate meaningful records and the client confirms readiness for review.
Stage 4 — Verify: confirm that it works
Purpose. Establish, on evidence, whether the design is working as intended and what must be improved.
Typical activities
- Conduct internal audits or effectiveness reviews against the design and applicable requirements, using audit techniques consistent with ISO 19011 guidance.
- Review performance indicators, benefits realised and residual risks.
- Facilitate management review and corrective action.
- Where the client is seeking certification, accreditation or external assurance, assemble a readiness file and support the client through the independent assessment — without participating in the assessment decision.
Typical outputs: internal audit or effectiveness report; corrective action plan; management review record; readiness file for external assessment; lessons-learned and sustainment plan.
Decision gate 4 — Handover. Ownership is formally confirmed with the client, together with the cadence for ongoing monitoring and improvement.
Principles that apply at every stage
Evidence standard
Each conclusion in a MART deliverable is traceable to a source: a client record, a measurement, a regulatory text, a standard requirement, or an explicitly stated and client-validated assumption. Where data is incomplete, we quantify its effect rather than ignore it.
Requirements traceability
For standards-based work, we maintain a map linking each requirement of the standard to the client's process, owner and evidence. This makes gaps visible early and avoids documentation that exists only to satisfy an auditor.
Proportionality
We scale documentation, controls and governance to the size, complexity and risk of the organisation. A ten-person company and a five-thousand-person multi-site group need different systems, even under the same standard.
Integration by design
Where a client operates — or plans — more than one management system, we design common elements once: context, risk, objectives, documented information, competence, internal audit and management review. This reduces duplication and audit burden.
Confidentiality
Client information is handled under agreed confidentiality terms and accessed only by those working on the engagement. Personal and sensitive data is minimised and protected.
Engagement models
| Model | Best suited to | What the client receives |
|---|---|---|
| Diagnostic | Understanding a problem or readiness before committing to a programme | Assess stage only, with a prioritised roadmap |
| Design and handover | Organisations with strong internal teams | Assess and Design, plus implementation guidance |
| Full implementation | Organisations needing hands-on support | All four stages, with MART working alongside client teams |
| Programme partnership | Multi-year or multi-site transformation | Integrated team, programme office and periodic verification |
| Retained advisory | Ongoing assurance and improvement | Scheduled internal audits, management review facilitation and on-call expertise |
Where our role ends
Our method stops short of activities that require independence or a licence. MART does not certify management systems, accredit conformity assessment bodies, verify or validate greenhouse gas statements, provide reasonable or limited assurance on sustainability reports, perform statutory audits, issue legal opinions or provide regulated investment advice. Where such activities are needed, we help clients define requirements, prepare evidence and coordinate with appropriately accredited or licensed providers.