Engineering and infrastructure advisory

Capital projects and the assets they create represent some of the largest financial commitments an organisation makes. We help owners and sponsors govern delivery, control cost, schedule and quality, and manage assets across their life for performance, risk and value.

The challenge

Large programmes of infrastructure, utilities, housing, healthcare and education facilities continue across the Gulf. Owners face persistent delivery risks: incomplete scope definition, design changes late in the project, cost and schedule growth, contractor quality issues, disputes, and weak handover of information to operations. Once assets are in service, many organisations lack reliable asset registers, criticality data and lifecycle plans, so maintenance becomes reactive and renewal decisions are made without evidence.

What we do

Project delivery governance

Quality, safety and information

Assets and facilities

How we work

  1. Assessproject or asset portfolio review: scope, governance, baselines, contracts, risk registers, quality records, asset data and maintenance history.
  2. Designgovernance and stage-gate framework; controls architecture; quality and HSE plans; information requirements; asset management framework and lifecycle cost models with our economic practice.
  3. ImplementPMO and controls procedures; training of project teams; contractor management processes; asset register and maintenance strategy roll-out.
  4. Verifyperiodic project assurance reviews; earned value and quality performance analysis; asset performance and maintenance effectiveness review; readiness for ISO 55001 or ISO 41001 certification if sought.

What you receive

  • Project governance framework and stage-gate criteria
  • Integrated project controls procedures and dashboard
  • Cost estimate and schedule risk analysis report
  • Project quality plan and inspection and test plan templates
  • Construction HSE plan and contractor evaluation criteria
  • Exchange information requirements and BIM execution plan
  • Strategic asset management plan, asset criticality model and lifecycle investment plan
  • Facility management operating model and service level specifications

Standards and frameworks

ISO 21502:2020 (project, programme and portfolio management guidance) · ISO 19650 series (information management using BIM) · ISO 55000/55001:2024 (asset management) · ISO 41001 (facility management systems) · ISO 9001 and ISO 10005 (quality plans) · ISO 45001 (occupational health and safety) · ISO 14001 (environment) · recognised international contract forms as specified in each project.

Scope and independence

MART provides project governance, controls, quality and asset management advisory. We do not provide engineering design, structural certification, statutory inspection or approval of works, or legal representation in disputes. Where engineering judgement must be signed by a registered professional engineer, this is provided by appropriately registered specialists engaged by the client or under a disclosed arrangement.

Frequently asked questions

Can you review a project that is already in difficulty?

Yes. A rapid project health check identifies root causes of cost, schedule or quality problems and sets out recovery options for the sponsor.

Is ISO 55001 relevant for us if we are not a utility?

Any organisation with significant physical assets — hospitals, universities, manufacturers, property owners and public authorities — can benefit from a structured asset management system.