Client challenges
- Progress reports do not match reality
- Change orders erode budgets
- Schedules lack logic and realistic durations
- Contingency is set by rule of thumb
Scope of the engagement
- Work breakdown and cost breakdown structures
- Cost estimating by project stage
- Schedule development and review
- Earned value management
- Change control
- Quantitative schedule and cost risk analysis
Methodology and workstreams
- Structure the projectDevelop work and cost breakdown structures linked to the contract, budget and schedule so cost and progress can be measured consistently.
- Estimate costPrepare or review estimates appropriate to project maturity using recognised estimate classification practice, stating accuracy ranges and key assumptions.
- Build and review schedulesDevelop or review logic-linked schedules for realistic durations, critical path integrity, float and resource loading.
- Measure performanceEstablish progress measurement and earned value reporting showing cost and schedule performance indices and forecasts at completion.
- Control changeChange control procedures that capture, assess and approve scope, cost and time changes promptly.
- Analyse risk quantitativelyMonte Carlo schedule and cost risk analysis to set contingency at an agreed confidence level, rather than by rule of thumb.
What we need from you
- Contract, scope documents and drawings
- Budget and existing estimates
- Schedules in native format
- Progress and cost data
Deliverables
- Work and cost breakdown structures
- Cost estimate or estimate review with accuracy range
- Schedule review report or baseline schedule
- Earned value reporting framework
- Change control procedure
- Quantitative risk analysis and contingency recommendation
Business outcomes and decision value
- Early warning of cost and schedule problems
- Contingency based on evidence
- Fewer unapproved changes eroding budgets
- Credible reporting to sponsors and lenders
Why MART
MART establishes cost and schedule baselines, change control and progress measurement that give early warning, and applies quantitative schedule and cost risk analysis where decisions require it. Controls are designed to be used by project teams, not only reported to sponsors.
Target industries
Applicable standards and frameworks
- ISO 21502:2020
- ISO 31000:2018
- recognised cost estimating classification practice
Related services and solutions
Scope and independence
Estimates are advisory; quantity surveying requiring professional registration is performed by qualified professionals.
Start the conversation
Controlling project cost and time? Request a consultation

