The challenge
Manufacturing in Kuwait and the Gulf — food and beverages, building materials, chemicals, plastics, packaging, metals and consumer goods — operates under pressure from imported competition, energy and water costs, workforce turnover, customer quality demands and growing environmental expectations. Many plants run with unmeasured losses: unplanned downtime, slow changeovers, scrap and rework, excess inventory, and quality problems found by customers rather than by the process.
Improvement initiatives often start well and fade because they depend on a few individuals rather than on a management system.
What we do
- Operational excellence diagnosticsloss analysis, value-stream mapping and an improvement roadmap with quantified benefits.
- Lean Six Sigma deploymentprogramme design, project selection, practitioner coaching and governance, consistent with ISO 13053 for the DMAIC methodology.
- Productivity and OEE improvementoverall equipment effectiveness measurement, availability, performance and quality loss reduction.
- Production planning and schedulingsales and operations planning, capacity models and scheduling rules.
- Manufacturing quality assurance and supplier qualityprocess control plans, statistical process control, inspection strategies and supplier quality management.
- Process safety managementprocess safety governance, hazard studies coordination and management of change (with qualified process safety specialists).
- Factory readiness and commissioning assessmentsoperational readiness of new lines and facilities: people, procedures, maintenance, quality and safety.
- Cosmetics good manufacturing practice readinessGMP systems for cosmetics production aligned with ISO 22716.
How we work
- Assessgo to the shop floor: observe, measure and map; analyse production, downtime, quality and cost data; interview operators, supervisors and maintenance teams.
- Designtarget performance and loss-reduction priorities; standard work; control plans; daily management system with tiered meetings and visual performance boards.
- Implementpilot on a model line; coach teams through structured improvement projects; train internal practitioners; extend across the plant.
- Verifymeasure sustained performance against baseline; audit standard work and control plans; integrate improvements into the quality management system.
What you receive
- Baseline performance dashboard and loss tree
- Value-stream maps (current and future state)
- Improvement project charters with financial validation
- Standard work, control plans and visual management standards
- Tiered daily management system design
- Supplier quality manual and supplier scorecard
- Operational readiness checklist and assessment report
Standards and frameworks
ISO 9001:2026 · ISO 13053 (quantitative methods in process improvement — Six Sigma) · ISO 22400 (key performance indicators for manufacturing operations management) · ISO 22716 (cosmetics GMP) · ISO 45001 · ISO 50001 · ISO 14001.
Related integrated solutions
Scope and independence
Our manufacturing advisory addresses management systems, processes and performance. It does not include equipment design, machinery safety certification, statutory inspection of pressure systems or process safety engineering sign-off, which require qualified engineers and, where applicable, accredited inspection bodies.
Frequently asked questions
How quickly can we expect results?
Well-chosen pilot improvements typically show measurable results within eight to twelve weeks. Sustaining them depends on embedding the daily management system and standard work.
Do you provide Lean Six Sigma belt certification?
We provide practitioner training and project coaching. Where a recognised external credential is required, we coordinate with an appropriate certification scheme.

