Client challenges
- Lines run below rated speed
- Frequent stoppages and long changeovers
- Capital is requested for new lines
- OEE data is unreliable
Scope of the engagement
- OEE measurement design
- Loss analysis
- Changeover reduction (SMED)
- Autonomous and planned maintenance
- Speed and quality loss reduction
- Daily performance management
Methodology and workstreams
- Design OEE measurementAgree the OEE formula, ideal cycle times, planned-downtime rules and loss categories, and set up data capture that operators trust, so that improvement is measured on a reliable baseline.
- Analyse lossesUse Pareto analysis of availability, performance and quality losses by line, shift and product to identify the few losses that matter most.
- Reduce changeover timeApply single-minute exchange of die (SMED) methods with operators to move tasks outside stoppage time and standardise changeovers.
- Improve equipment careIntroduce autonomous maintenance — cleaning, inspection, lubrication by operators — and planned maintenance to reduce breakdowns and minor stops.
- Remove speed and quality lossesSolve root causes of slow running, minor stops, start-up losses and defects using structured problem-solving.
- Manage performance dailyInstall shift and daily performance meetings with visual boards so that losses are escalated and resolved quickly.
What we need from you
- Production data
- Line access
- Operator and maintenance time
- Engineering support
Deliverables
- OEE measurement design
- Loss analysis
- SMED results
- Maintenance improvements
- Loss reduction actions
- Daily management system
Business outcomes and decision value
- Higher output from existing assets
- Deferred capital investment
- Lower unit cost
- Reliable performance data
Why MART
MART improves OEE by measuring losses accurately and attacking their causes — changeovers, breakdowns, minor stops, speed and quality losses. Improvement is integrated with maintenance, planning and quality systems so that gains are sustained.
Target industries
Applicable standards and frameworks
ISO 22400-2 (manufacturing KPIs)
Related services and solutions
Scope and independence
Equipment modifications are performed by qualified engineers.
Start the conversation
Increasing line output? Request a consultation

