Client challenges
- A new plant or line is about to start
- Ramp-up targets are aggressive
- Previous start-ups had quality or safety problems
- Operations teams were not involved in design
Scope of the engagement
- Readiness criteria and stage gates agreed with the project and operations teams
- Organisation design, staffing plan and operator training for start-up
- Operating procedures, work instructions and quality and safety standards
- Maintenance strategy, spare parts and CMMS readiness
- Quality control, laboratory and HSE systems ready before first production
- Ramp-up plan with performance targets and early-life support
Methodology and workstreams
- Define readiness criteriaAgree measurable readiness criteria for organisation, procedures, maintenance, quality, safety and information systems that must be met before start-up.
- Prepare the organisationFinalise the organisation design, recruit and train operators and supervisors in time for commissioning, using the vendors' training where appropriate.
- Prepare proceduresWrite operating procedures, standard work and start-up and shutdown instructions with the operators who will use them.
- Prepare maintenanceLoad maintenance plans, spare parts and asset data into the CMMS before handover.
- Prepare quality and safety systemsCommission quality control, permits, inspections and emergency arrangements.
- Plan ramp-upSet a ramp-up curve with daily performance tracking and rapid issue resolution between operations, engineering and vendors.
What we need from you
- Project schedule
- Equipment information
- Organisation plans
- Operations team
Deliverables
- Readiness criteria
- Organisation and training plan
- Procedures
- Maintenance readiness plan
- Quality and safety systems
- Ramp-up plan
Business outcomes and decision value
- A faster, more predictable ramp-up to nameplate capacity
- Fewer start-up incidents, quality failures and unplanned stoppages
- Product that meets specification from the first commercial batches
- Operations, maintenance and quality teams ready on handover day
Why MART
MART assesses operational readiness alongside commissioning: organisation, competence, procedures, maintenance, supply chain, systems and management controls. Readiness plans are tracked through to start-up so that new facilities reach stable performance sooner.
Target industries
Applicable standards and frameworks
ISO 9001:2026 · ISO 45001
Related services and solutions
Scope and independence
Commissioning of equipment is performed by engineers and vendors.
Start the conversation
Preparing to start up? Request a consultation

