The problem this solves
Energy and emissions programmes in industry are often run by sustainability or engineering teams, while productivity and quality improvement are run by operations. The two compete for the same management attention and capital, and neither captures the interactions: a reduction in scrap is also a reduction in embodied energy; a shorter changeover cuts idle consumption; a better maintenance strategy reduces both downtime and energy losses.
Who it is for
Manufacturers and process industries with significant energy, water or materials costs — food and beverage, building materials, chemicals and plastics, metals, packaging and consumer goods — particularly those facing customer requests for product carbon data or reporting obligations.
What the solution combines
| Discipline | Contribution | MART practice |
|---|---|---|
| Operational excellence | Loss analysis, OEE, Lean methods, standard work | Manufacturing and Industrial Advisory |
| Energy management | Energy review, significant energy uses, energy performance indicators, ISO 50001 | Sustainability and Climate Advisory |
| Carbon accounting | Site and product-level emissions baselines | Sustainability and Climate Advisory |
| Maintenance and reliability | Criticality, maintenance strategy and reliability improvements | Engineering and Infrastructure Advisory |
| Investment appraisal | Business cases and prioritisation for capital projects | Economic and Financial Advisory |
| Management systems | Integration into ISO 9001, ISO 14001 and ISO 50001 controls | Management Systems and Certification Readiness |
Delivery model
Phase 1 — Integrated plant diagnostic (6–8 weeks)
- Production loss tree and OEE baseline by line.
- Energy review: metered and estimated consumption by significant energy use; load profiles; baseline and energy performance indicators.
- Water and waste balance.
- Site emissions baseline; product-level carbon intensity where data permits.
Gate 1: Plant leadership agrees the combined baseline and the loss and energy priorities.
Phase 2 — Opportunity design (6–10 weeks)
- Joint register of opportunities scored for throughput, quality, cost, energy and emissions effects.
- Quick wins (operational and behavioural) separated from projects requiring capital.
- Business cases for capital projects with payback, net present value and emissions abatement cost.
- Measurement and verification plans for savings.
Gate 2: Management approves the improvement portfolio and the capital requests.
Phase 3 — Implementation (3–9 months)
- Model-line deployment of standard work, changeover reduction and autonomous maintenance.
- Energy controls embedded in operating procedures and the ISO 50001 system.
- Daily and weekly performance reviews including energy per unit and scrap rates.
- Support for engineering teams on capital project specification and commissioning readiness.
Phase 4 — Verification and sustainment (ongoing)
- Measured savings against baseline using agreed adjustment methods.
- Internal audit and management review of integrated systems.
- Update of emissions inventory and product carbon data.
What the client receives
- Integrated loss, energy and emissions baseline
- Opportunity register with multi-criteria scoring
- Capital business cases and measurement and verification plans
- Standard work, control plans and energy operating controls
- ISO 50001-aligned energy review, indicators and objectives
- Performance dashboard combining productivity, quality, energy and emissions
- Updated site emissions inventory
Decision value
Management can invest where the combined return — cost, capacity, quality and emissions — is highest, and can show customers and lenders a credible link between operational improvement and carbon reduction.
Standards and frameworks
ISO 50001:2018 (Amendment 1:2024) · ISO 50006 (energy baselines and indicators) · ISO 50015 (measurement and verification of energy performance) · ISO 14001:2026 · ISO 14064-1 · ISO 14067 · ISO 9001:2026 · ISO 22400.
Scope and independence
Equipment design, electrical and mechanical engineering sign-off and statutory inspection are performed by qualified engineers and accredited inspection bodies. Savings estimates are subject to measurement and verification; MART does not guarantee savings unless separately agreed in a performance-based contract.