Consulting, technology, engineering and transformation · Space Tower, Mirqab, Kuwait City +965 2228 8091info@mart-solution.comVerify a certificateالعربية
MART Solution العربية

Sustainability and Climate Advisory

GHG project documentation

Emission reduction and removal projects must demonstrate real, additional and measurable outcomes. We help project developers prepare documentation that validators and programmes can assess.

Client challenges

  • A project may generate carbon credits or reportable reductions
  • Baselines and additionality arguments are weak
  • Monitoring plans are impractical
  • Programme rules are unfamiliar

Scope of the engagement

  • Project eligibility screening
  • Baseline scenario and additionality
  • Project boundary and GHG sources, sinks and reservoirs
  • Quantification methodology
  • Monitoring plan
  • Project documentation for validation

Methodology and workstreams

  1. Screen eligibilityAssess whether the project fits the rules of the selected crediting programme or reporting purpose, including project type, start date, location and likely additionality.
  2. Establish the baseline and additionalityDefine the baseline scenario and demonstrate additionality using the programme's tools — investment, barrier or common-practice analysis — with evidence that withstands validation.
  3. Define the project boundaryIdentify GHG sources, sinks and reservoirs controlled by, related to or affected by the project, including leakage.
  4. Quantify reductions or removalsApply the approved programme methodology or ISO 14064-2 approach to estimate emission reductions or removals, documenting assumptions and uncertainty.
  5. Design a practical monitoring planSpecify parameters, measurement methods, equipment, frequency, responsibilities and quality control that operations can sustain.
  6. Prepare project documentationCompile the project description for independent validation; MART does not validate, verify, trade or broker credits.

What we need from you

  • Project design information
  • Baseline data
  • Programme selection
  • Monitoring capabilities

Deliverables

  • Eligibility screening
  • Baseline and additionality analysis
  • Boundary definition
  • Quantification workbook
  • Monitoring plan
  • Project documentation

Business outcomes and decision value

  • Projects ready for independent validation
  • Credible quantification
  • Practical monitoring
  • Reduced risk of rejection

Why MART

Project documentation must satisfy programme rules, methodologies and validators. MART prepares baseline, additionality, monitoring and quantification documentation with traceable evidence, aligned with ISO 14064-2 and the chosen programme, so that validation proceeds efficiently.

Applicable standards and frameworks

  • ISO 14064-2:2019
  • rules of the selected crediting programme
  • ISO 14064-3:2019 for validation and verification

Scope and independence

Validation, verification and credit issuance are performed by independent bodies and programme operators. MART does not trade or broker credits.

Start the conversation

Developing a GHG project? Request a consultation